Biomassa di grandi impianti a combustibile impianto di alimentazione. Il 44 MWe gorgogliamento di letto fluidizzato sistema, Steven's Croft, più grande del Regno Unito, legna per la stazione di biomassa Lockerbie UK
4865 x 3228 px | 41,2 x 27,3 cm | 16,2 x 10,8 inches | 300dpi
Data acquisizione:
18 luglio 2013
Ubicazione:
Lockerbie, Scotland, United Kingdom
Altre informazioni:
Kvaerner Power supplied the power boiler, based on a bubbling fluidised bed combustor, the fuel handling system and the flue gas cleaning plant. The power island includes the steam turbine, generator, air cooled condenser, transformers, and the required piping network. Siemens PG and Kvaerner will in partnership supply a Siemens PCS7 control system for their respective areas and the interface between the two control systems. All auxiliary buildings will be supplied by Siemens, including an office/control room, a work shop, water tanks and the necessary road networks within the plant. The power boiler, with steam capacity of 126 MW, is a bubbling fluidised bed type supplying steam for an SST800 steam turbine, which powers an Sgen5-100A-2P generator producing approximately 51 MW. With the electrical house load at approximately 7 MW, this results in a net output of 43.9 MW. The plant will initially burn forest residue consisting of sawdust, branches and offcuts from a sawmill situated close by. E.On is also hoping that local farmers will switch to producing fast-growing willow which would become part of the fuel mix for the plant.