5472 x 3648 px | 46,3 x 30,9 cm | 18,2 x 12,2 inches | 300dpi
Data acquisizione:
9 agosto 2016
Ubicazione:
St Peter's Square, Manchester M2 5PD
Altre informazioni:
Phase 2CC – Second Manchester Metrolink City Crossing With increased tram traffic brought about by the expansion of the Metrolink network, it became necessary to build a new route across Manchester City Centre to alleviate congestion and improve capacity. Known as the Second City Crossing (or 2CC), the project involved laying 0.8 miles (1.3 km) of tram tracks from St Peter's Square tram stop via Princess Street, Albert Square, Cross Street and Corporation Street to rejoin the original Metrolink line just before Victoria station. One new tram stop was built at Exchange Square. The project also involved re-ordering St Peter's Square and re-siting the Cenotaph to accommodate an enlarged tram interchange and junction. Construction began in 2014 and the 2CC route opened fully in February 2017